S/N

Description

ContractAmount (US $)

Owner

Engineer

1

Reconstruction of San Gabriel Sewage Pump Stations and Force Mains

519,402

City of San Clemente

James H. Smith, PE

2

Forster Ranch Water Pump Station No. 2 and Reservoir 1-4 Appurtenances (P.R.D) San Clement, CA

303,933

Estrella Properties Ltd

Madole and Associates

3

Rose & Tecolote Creek Storm Drain Interceptors, Phase III, Work Order No. 164063 (two sewage lift stations and sewer lines)

196,020

City of San Diego

Tetra Tech/Richardson

4

Pacific Beach Trunk Sewer Manhole Replacement: Phase I, Work Order No. 147223/037349

669,131

City of San Diego

Owner

5

Improvement of Buena Vista and Aqua Hedionda Pumping Stations, Carlsbad, CA

301,809

City of Vista

Wilson Engineering

6

Pacific Beach Trunk Sewer Manhole Replacement: Phase II, Work Order No. 170041/037379

699,994

City of San Diego

Owner

7

Oceanside Blvd. Sewer Lift Station and Force Main

289,000

City of Oceanside

McDonald Stephens

8

2 Water and 3 Sewer Pump Stations, Golden Triangle Assessment District, Murrieta Hot, Springs, CA

1,371,477

Eastern Municipal Water District

Wilson F.So& Assoc.

9

Group 82, Sewer Main Replacement

1,039,925

City of San Diego

Owner

10

Hydrogeneration Facilities

620,000

Olivenhain Municipal Water District

Boyle Engineering Corporation

11

Antelope Road Reservoir Site Work

259,015

Rancho California Water District

McGoldrick Engineers, Inc.

12

Tuscany Hills Reservoir

254,399

Homestead Land Development Corporation

Sidawi and Associates

13

Tuscany Hills Booster Pumping Stations

467,900

Homestead Land Development Corporation

Sidawi and Associates

14

Mission Avenue at College Boulevard Phase II (361-77-9950) Oceanside, CA

1,413,618

City of Oceanside

City of Oceanside

15

Roll Reservoir, Appurtenant and Sub Drain Pipe Work

666,322

Otay Water District

Owner

16

Effluent Storage Pond Sludge Drying Beds, San Vicente WWTP

937,117

Ramona Municipal Water District

Black and Veach

17

First Class Alley Improvement and Sewer Replacement, Bid No. 9762X

256,265

City of San Diego

Owner

18

E. Mission Bay Interceptor

1,165,351

City of San Diego

Owner

19

Well 5660 and Pumping Plant

345,280

Coachella Valley Water District

Owner

20

Chemical Feed System Upgrade, City of San Diego, W.O 70811

615,692

City of San Diego

McDonald Stephens

21

Warm Springs Creek Sewage Lift Station

2,001,921

Eastern Municipal Water District

Wilson F. So. and Associates

22

Sewer and Main Replacement Group 92, W.O. 171101/180711

1,058,000

City of San Diego

Luke Dudek Civil Engineers

23

Sewer Pump Station 12

333,029

Belmont Park Associates, Inc.

Luke Dudec Civil Engineers

24

Pump Station No. 1 Pump no. 2 and Pump No. 5 Installation, W.O 170321

1,764,905

City of San Diego

Engineering Science

25

Install 8’’ and 12’’ Sewer Force Main and Appurtances El Norte Parkway

187,704

City of Escondido

Owner

26

Mission Bay Sewage Interceptor System Phase 1, W.O. 171151

2,216,222

City of San Diego

Pocintey and Associates

27

Sweetwater Reservoir Pump Station

252,700

Sweetwater Authority

Boyle Engineering Coporation

28

Metro Pumping Station No. 2 – 7th Pump Installation W.O. 171641

647,604

City of San Diego

Brown and Caldwell

29

Robert A. Perdue Water Treatment Plant – Raw Water Pump Station Improvements

850,574

Sweetwater Authority

Engineering Science

30

Repair Load Equalization Tanks at the Naval Air Station North Island, Contract N68711-88-C-1802

352,571

US Navy

Owner

31

Imperial Beach Pump Station 1B Relocation and Sewer Force Main

367,907

City of Imperial Beach

Bement, Daiwood, Sturgeon

32

National City Wells Tanks, W.O. 2343.0

198,811

Sweetwater Authority

Owner

33

Hydrocarbon Recovery System, Lindbergh Filed, Spec. No. 90-36

609,582

San Diego Unified Port District

Geocon

34

Galloway Valley Pump Station, Modifications and Energency Storage, Activity No. LA301

393,192

County of San Diego

HYA Consulting Engineers

35

East Mission Gorge Interceptor System, Contract No. 2 – Pump Station, W.O 170361

5,477,980

City of San Diego

Black and Veatch

36

Southcreek Booster Pump Station

817,204

Pardee Construction/City of San Diego

NBS/Lowry

37

Mission Bay Sewage Interceptor System (MBSIS) – Phase II, W.O. 171571

1,042,400

City of San Diego

John S. Murk Engineers Inc.

38

Mission Bay Sewage Interceptor System – Phase III and IV, W.O 172031

1,488,100

City of San Diego

Brown and Caldwell

39

Carlsbad Sewer and Water Main Replacement Project

845,219

City of Carlsbad

Owner

40

Grossmont College Storm Drain Repair

322,000

Grossmont

Owner

41

Chollas Valley Trunk Sewer

1,822,104

City of San Diego

Owner

42

Cortez Sewer Main Replacement

358,000

City of San Diego

Owner

43

Accelerated Sewer Replacement Group

1,233,633

City of San Diego

Owner

44

Sewer and Water Group 615

2,340,174.50

City of San Diego

Owner

45

Sewer Main Replacement 643A

1,153,907

City of San Diego

Owner

46

Catalina Blvd. Trunk Sewer Phase II

562,028

City of San Diego

Owner

47

Sewer Group 464B

733,587.25

City of San Diego

Owner

48

Sewer Group 660

1,623,561

City of San Diego

Owner

49

Sewer Group 627

1,778,783

City of San Diego

Owner

50

Home Avenue Trunk Sewer Contract III

2,793,099

City of San Diego

Owner

51

Sewer Group 708

1,585,348

City of San Diego

Owner

52

South Pacific Highway Trunk Sewer and Water Group 535

4,888,574.74

City of San Diego

Owner

 


Home ] CSWC Strategy ] [ Projects Completed ] General Information ] Key Personnel ] References ] Contact Information ] Feedback ] Search ]

 
To view the Cal Southwest Construction brochure, click here (viewable using Adobe Acrobat Reader)
Send mail to calsouth@calsouthwest.com with questions or comments about this web site.
Copyright © 2002 Cal Southwest Construction Inc.
Last modified: 08/08/04